arxiveess.SYcs.DCnlin.AO2026-07-22

Do Co-Located AI Training Jobs Synchronize? Load-Dependent Throttling as a Coupling Mechanism for Phase-Locking Behind a Shared Power Cap

Brieuc Le Roux Tardif

Large-scale AI training turns computing facilities into multi-megawatt loads whose power draw is periodic: tens of thousands of accelerators step in lockstep between compute-bound phases near peak power and communication-bound phases where they idle. Prior work treats each facility as an exogenous periodic forcing on the grid. We pose the operator's question instead: when many independent training jobs share one oversubscribed power envelope, do their cycles stay independent, so aggregate fluctuation grows as the square root of the number of jobs, or can the power-management stack phase-lock them into linear growth? This is emergent synchronization in a population of nonlinear oscillators - the Kuramoto setting - but classical coupling is absent, since accelerator clocks are decoupled from line frequency. We identify the coupling channel in load-dependent throttling: caps, voltage droop, and shared cooling slow computation exactly when aggregate demand is high. Formalizing the fleet as a generalized Kuramoto system, we obtain three operator-facing statements. Dimension: the coupling is repulsive to leading order and turns attractive only when the control loop's phase lag exceeds half a cycle; protection is mode-selective, so rate diversity is required. Detect: frequency-correlated frustration makes the onset first-order and hysteretic. Mitigate: phase-scattering scheduling raises every mode threshold at once. The prediction is falsifiable by a two-job co-capped measurement, which we specify.

View free PDFSource page

Related papers

arxivcs.MAcs.AIcs.CYcs.DCeess.SY2026-07-19

The Optimization Trilemma: Efficiency, Comfort and Fairness in Decentralized Multi-agent Coordination

Jovan Nikolic, Maciej Krzysztof Zuziak, Evangelos Pournaras

The problem of fair multi-agent coordination in decentralized settings is one of the most pressing challenges for building efficient collaborative systems. Resource allocation is based on optimized collective arrangements accounting for agents' needs. Such coordination should not…

View free PDFSource page
arxiveess.SY2026-07-31

Hybrid Virtual Space Vector Modulation With Extended Power Factor Range for Coupled Eight-Switch Three-Phase Three-Level Inverter

Xiaojun Deng, Hongliang Wang, Tianfu Sun, Yang Jiang, Yibo Si, Wenbo Tang, et al.

With the development of photovoltaic (PV) and motor drive, the coupled eight-switch three-phase three-level inverter (TP-TLI) is receiving more attentions. However, the previous modulation strategies for coupled eight-switch TP-TLI are suitable for high power factor (PF), which c…

View free PDFSource page
arxivcs.ROcs.AIeess.SY2026-07-31

FBFM: A Training-Free Asynchronous Feedback Mechanism for Flow-Matching in World-Action Models Execution

Peize Li, Ruimeng Zhang, Ru Zhang, Cong Huang, Kai Chen, Shanghang Zhang

Although world-action models (WAMs) enhance long-horizon robot control by predicting visual evolution before acting, long-horizon reliability demands repeated re-grounding in real observations--not recursive rollout. Existing WAMs address this by refreshing history or KV cache wi…

View free PDFSource page
arxiveess.SY2026-07-15

Assessing Risks of Hydro-Generator Shaft Fatigue from Data Center Load Oscillations

Kaustav Chatterjee, Meghana Ramesh, Shuchismita Biswas, Brett A. Ross, Antos C. Varghese, Sameer Nekkalapu, et al.

Large AI data center loads can introduce persistent sub-synchronous active-power oscillations that may impact nearby generators by exciting torsional modes and increasing shaft stress. This paper presents a model-based framework for evaluating hydro-generator shaft fatigue risk u…

View free PDFSource page